User Tools

Site Tools


dev:meetings:2011-08-02

Developer meeting: August 2, 2011

Meeting takes place on IRC on the #evergreen channel on Freenode. See the Calendar for specific dates and times.

Held at

  • 09:00:00 a.m. Tuesday August 2, 2011 in America/Los_Angeles
  • 12:00:00 p.m. Tuesday August 2, 2011 in Canada/Eastern
  • 16:00:00 Tuesday August 2, 2011 in UTC

Last meeting:

Logs and minutes

  • Minutes will be supplied in this document after the meeting finishes.

Prior to the meeting

  • Please fill out Who's who if you want to be identified more readily in the future

Agenda

  1. Determine the taker of minutes: Ben Shum (bshum)
  2. Determine meeting leader: Anoop Atre (moodaepo)
  3. Review action items
    1. gmcharlt working on: LP 740320 and LP 520175 ( related work )
      • STATUS: LP740320 was assigned to eeevil, LP520175 continues to be gmcharlt.
    2. gmcharlt to review LP 787162, LP 758945
      • STATUS: Still in process.
    3. gmcharlt suggested that we have a pullrequests review meeting opposite to dev meetings (to be added to mailing list for discussion)
      • STATUS: Voted through by participating dev members and first meeting took place on 2011-08-08 at 12 pm EST.
      • Main goal was for core devs to clear the pullrequest queue, but testers with signoff ability were welcome to attend.
    4. phasefx will take an action for making a custom git command to spit out the invocation for checking out a specific branch from a specific repository

Template::Toolkit merge status

  • Conifer hosted a dev session in June in the attempt the accelerate the development of the TT OPAC; there is strong interest in adopting the TT OPAC prior to September (for obvious academic year reasons)
  • On July 29, Dan Scott asked on IRC what steps would need to be taken to get TT OPAC branches merged to master; Lebbeous Fogle-Weekley replied:
I have a strong desire to merge equinox work and conifer work on
tt opac before any divergence gets any messier (so maybe next week?)
The plan is to merge the Template Toolkit code into Evergreen master 
before (at the latest) the 2.2 feature freeze, so that it will be 
included in Evergreen 2.2.  We have a few remaining TODO items (branch 
merging, wiring things up), but I'm not anticipating any real 
complications there.
  
The goal for 2.2 is to replace the slimpac by default and not (yet) to 
replace the regular patron and staff-embedded OPAC.  However, it will be 
possible to use T-pac for both with a small amount of configuration.

Patch review queue

We don't want to let submitted patches rot, here's a list of bugs with attached patches

Also a list of bugs with "pullrequest" tags that may also contain patches

New section of dev:git with some steps for adding a signoff.

A spreadsheet of bugs that could use some attention (statuses, confirmation, etc.) is available at http://goo.gl/a9SAQ

(Note: patch review was pushed off to 2011-08-08 pullrequest meeting)

Evergreen release statuses

  1. Evergreen release status:
    1. 1.6.1.x (current release = 1.6.1.8)
      1. Bugs targeted to 1.6.1.9
    2. 2.0.x (current release = 2.0.7)
      1. Need to mark 2.0.7 as closed and released on LP. (Done)
      2. Bugs targeted to 2.0.8
    3. 2.1.x (current release = 2.1-rc1)
      1. Status check

Next meeting

dev/meetings/2011-08-02.txt · Last modified: 2022/02/10 13:34 by 127.0.0.1

Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 4.0 International
CC Attribution-Share Alike 4.0 International Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki

© 2008-2022 GPLS and others. Evergreen is open source software, freely licensed under GNU GPLv2 or later.
The Evergreen Project is a U.S. 501(c)3 non-profit organization.