zzz_archive:edc_install
We have a lot to do vis a vis our move to EDC, so as Brad suggested here's an online list of tasks. Feel free to add your name to as many as you like and add a strikethrough tag around any you complete. I've started the process based on current plans, but feel free to change whatever you see fit.
GOALS
Get demo mini-cluster running. This is the cluster that is meant just to run for demos and presentations. – miker, berickGet Dev cluster going on new hardware.– miker, berickMigrate current penguin to penguin II (I almost put this down as a task, but it's a really big when you start to think about it). – bradl, phasefxNeed to change the CVS sync so that seed is pushing changes to penguin, not penguin pulling from seed – phasefxIntegrate current dev servers into new framework.Move GPLS IT stuff to EDC, get the 3rd rack going.3rd rack is powered, but some of the IT server move is going to take an extended period of time. – andrew, bradl(Attempt to) Set up video conferencing stuff using OpenMCU – miker
TASKS
Daemonize OpenMCU – mikerReplace the faulty 48 port switch (HP shipped, will be at EDC Monday). – bradlGet fibre NIC replacement (HP shipping). – bradlReplace dead Elroy drive (ditto). – bradlNIS stuff. – berickDHCP for cluster. – berickConfig 48 port switches. – bradl (Yay for incorrect cables!)Ethernet cable labeling (about 50% done now) – bradlProper power config (ensure that dual power machines go to two power sources, etc). – bradlComplete ethernet wiring. – bradlComplete KVM wiring. – bradlConfig KVM for remote access. – bradlInstall blanking panels. – bradlInstall VPN on rosie for cubes. – bradl (with a little help from his friends )Get Active-Active on T-bone and Porkchop.We're delaying this. Currently, we have High Availability, but no session failover. There are two main routes to take with this, saru and ct_sync. I suspect ct_sync will be standard in the kernel in the future, but currently it has issues with NAT. – phasefxInstall Linux and Evergreen on DB, App, and Logger servers. – berick, mikerConfig SAN. – bradlResearch peachnet OC-3 – andrewDNS changes. – bradl can handle the public-facing DNS changesInstall 2nd 110v power strip in cabinet #2. – bradl (I asked Andrew to grab it from Clairmont for me)This does not exist. Andrew is going to purchase one.Arrange power for cabinet #3. – bradlResearch and purchase redundant power supplies for 48-port switches. – bradlResearch dual-power supplied front-end switch. – bradlResearch supplying UPS for cube-space switch. – bradlFigure out what the heck is going on with the KVM expansion module in the bottom of rack #2. – bradlIt was a defective KVM cable. Get replacement from HP. HP has shipped. – bradlNow re-do ethernet cabling to go to re-arranged switches. – bradlMove Seed to EDC. – bradlGet App08 replacement hard drive (HP shipped)– bradl- SNMP monitoring. – bradl, miker
- Get NIC for Rosie. – miker
Build 3rd rack. – andrew, bradlFigure out what's going on with OpenMCU vis a vis the crazy UDP packet storm.Short term fix is rate-limiting the traffic. – miker!!
zzz_archive/edc_install.txt · Last modified: 2022/02/10 13:34 by 127.0.0.1