evergreen-docs:reorg_2014:requirements
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
evergreen-docs:reorg_2014:requirements [2016/01/25 11:41] – [Introduction] sandbergja | evergreen-docs:reorg_2014:requirements [2016/02/04 14:13] – [Requirements] adding horizontal rule sandbergja | ||
---|---|---|---|
Line 1: | Line 1: | ||
====Introduction==== | ====Introduction==== | ||
- | This document describes a proposed project to re-organize the official documentation of Evergreen. | + | This document describes a proposed project to re-organize the official documentation of Evergreen. |
===Methodology=== | ===Methodology=== | ||
Line 45: | Line 45: | ||
+ | ---- | ||
====Requirements==== | ====Requirements==== | ||
===Structure requirements=== | ===Structure requirements=== | ||
Line 67: | Line 68: | ||
* We need a separate server for the re-organized docs so that we can test our docs on end users without interrupting access to the current documentation. | * We need a separate server for the re-organized docs so that we can test our docs on end users without interrupting access to the current documentation. | ||
* We need to identify a group of beta testers for each book that will test out each book in their day-to-day operations. | * We need to identify a group of beta testers for each book that will test out each book in their day-to-day operations. | ||
+ | |||
+ | ---- | ||
====Proposed timeline==== | ====Proposed timeline==== | ||
* February 2016: Decide on coordinators who are passionate about each audience | * February 2016: Decide on coordinators who are passionate about each audience | ||
* February 2016: Finalize the audiences | * February 2016: Finalize the audiences | ||
* March 2016: | * March 2016: |
evergreen-docs/reorg_2014/requirements.txt · Last modified: 2022/02/10 13:34 by 127.0.0.1